B2B Shipping, Bulk Freight & Dispatch Policy
Core Blast Solutions operates exclusively as an industrial B2B supplier of certified surface preparation consumables and machinery. Unlike retail B2C e-commerce platforms shipping small courier parcels, our logistics infrastructure is engineered for heavy industrial consignments ranging from 100 kg (4 bags) up to 10,000 kg (10 Metric Tonnes) and multi-ton Full Truckload (FTL) dispatches across India.
Consignment Weight Tiers & Transport Modes
All abrasive media (Micro Soda-Lime Glass Beads, Cast Steel Shots, Angular Steel Grit, Fused Aluminium Oxide, and Plastic Media) are packed in heavy-duty 25 kg moisture-proof HDPE valve bags with internal polyethylene liners, or palletized into 1,000 kg (1 Metric Tonne) shrink-wrapped jumbo loads.
| Consignment Tier | Weight Range | Transport Mode | Standard Dispatch & Transit |
|---|---|---|---|
| Tier 1: Trial & Small Batch | 100 kg – 475 kg (4 to 19 Bags) |
B2B Surface Express / Part-Load Cargo (e.g., Safexpress, Gati, TCI Freight) | Dispatched within 24–48 business hours of payment/PO confirmation. Door-step or Godown delivery. |
| Tier 2: Medium Industrial LTL | 500 kg – 2,975 kg (20 to 119 Bags / 1–2 Pallets) |
Less-Than-Truckload (LTL) Commercial Surface Transport | Dispatched within 48 business hours. Palletized or loose-bagged per buyer’s plant receiving capability. |
| Tier 3: Bulk & Full Truckload (FTL) | 3,000 kg – 10,000 kg+ (3 MT to 10+ MT Dedicated) |
Dedicated Direct Point-to-Point Truck (Eicher 14ft/17ft/19ft or Open/Container Taurus) | Direct factory/warehouse gate-to-gate transit with zero transshipment hubs. Fastest transit & lowest per-kg freight. |
Freight Billing & Delivery Terms (Ex-Works vs. FOR)
Because freight rates for heavy industrial cargo (100 kg to 10,000 kg) fluctuate based on destination PIN code, diesel surcharges, and vehicle tonnage, shipping charges are never hidden inside inflated unit prices:
- Ex-Works / Ex-Warehouse (Standard): Quoted material rates are Ex-Warehouse (Delhi NCR / Regional Dispatch Hub). Freight is either billed at actuals on our GST Tax Invoice (with 18% GST) or arranged on a “To-Pay” basis directly through the buyer’s nominated transporter.
- FOR Destination (Free on Rail/Road): For bulk orders (1,000 kg to 10,000 kg+), we provide firm, all-inclusive FOR Destination quotations delivered straight to your plant gate.
- Minimum Order Quantity (MOQ): Commercial dispatches commence at 100 kg (4 bags of 25 kg). *(Note: Dedicated 1 kg engineering evaluation samples are dispatched separately via air/surface courier upon technical verification).*
Mandatory Dispatch & Quality Documentation
To ensure smooth gate entry at your manufacturing facility, foundry, or refinery receiving bay, every shipment is accompanied by the following statutory and technical documents (both physically in the driver docket and digitally via WhatsApp/Email):
100% compliant GST Tax Invoice (GSTIN: 07CRXPP7267E1ZZ) with accurate HSN codes (7018, 7205, 2818, 8424) and government-generated E-Way Bill for all consignments exceeding statutory value thresholds.
Lot-traceable Manufacturer’s Test Certificate (MTC) detailing Ro-Tap sieve granulometry, XRF chemical assay, hardness, and sphericity verification.
Official transporter docket number, vehicle registration details, and driver contact number shared immediately upon gate-out for live shipment tracking.
Detailed bag/pallet count and net/gross weight verification slip matching your Purchase Order line items.
Estimated Transit Timelines, Unloading & Transit Claims
- Estimated Transit Timelines:
- North India (Delhi NCR, Haryana, Punjab, Rajasthan, UP, Uttarakhand): 1 to 3 Business Days.
- West & Central India (Maharashtra, Gujarat, MP, Chhattisgarh): 3 to 5 Business Days.
- South & East India (Tamil Nadu, Karnataka, Telangana, AP, West Bengal, Odisha): 4 to 7 Business Days.
- Plant-Gate Unloading Responsibility: Unless crane or forklift unloading is explicitly contracted in writing prior to dispatch, unloading at the destination factory gate is the responsibility of the buyer. For 1 MT palletized loads, the buyer must ensure a forklift or hydraulic pallet jack is available at the receiving dock. Detention charges caused by unloading delays beyond 12 hours of vehicle arrival will be borne by the consignee.
- Transit Insurance & Shortage/Damage Reporting: All consignments are dispatched in moisture-sealed packaging. In the rare event of bag tearing, moisture ingress, or short-delivery during transit, the receiving storekeeper must note the exact damage/shortage remarks on the transporter’s Proof of Delivery (POD / LR copy) at the time of unloading and notify our logistics desk within 24 hours with photographic evidence so an insurance/transporter claim can be processed immediately.
Need an exact LTL or Full Truckload (100 kg – 10,000 kg) freight estimate to your factory PIN code?
